Search

How long a PU adhesive takes to cure depends on the grade, the temperature and — for moisture-cure types — the humidity route you give it. This lookup shows the actual cure figures from our TDS sheets for each grade and process route. Pick a grade to see its numbers; every value below comes straight from the product's technical data sheet, not from interpolation.


Why There Is No Universal Cure-Time Curve

Cure chemistry differs by grade, so temperature affects each one differently:

That is also why we publish discrete tested figures rather than a smooth time-temperature curve: the TDS values above are what was actually measured.

Reading the Numbers for Your Line

  1. Match open/pot time to your lay-up speed first. A cure you can shorten with steam or mist; an exceeded open time you cannot fix.
  2. Check your shop temperature against the grade's floor. The rebond binders want 20°C minimum; below it, plan the steam route.
  3. Plan de-mould and handling around the cure figure, then add aging. Handling strength and full cure are different points — rebond blocks want ~24 h before cutting regardless of route.

FAQ

Can I speed up a 1K PU cure with heat alone?

Heat without moisture does little for a moisture-cure grade. Steam (heat + moisture together) is the effective accelerator — 120°C steam takes the rebond binders from hours to 10–14 minutes.

Does cold weather stop 2K PU from curing?

PU-50 cures at room temperature; in a cold shop the reaction slows but proceeds. For service at extreme cold the relevant evidence is tested joint strength — PU-50 is rated ≥12 MPa at −137°C.

My grade is not listed — where are its figures?

Each product page carries its own TDS. For sandwich-panel consumption planning, see the adhesive coverage calculator; for anything else, contact us and we will send the TDS for your grade.

Related guides: how to reduce polyurethane curing time · PU adhesive in low-temperature environments · rebonded foam application guide.