Application workflow
How to Apply PU Adhesive Correctly
Correct application means following the named grade TDS and controlling the actual line—not applying one temperature, coating weight or cure time to every PU adhesive.
1. Identify the system
For 1K adhesive, control moisture exposure, open time and container handling. For 2K adhesive, verify the supplied ratio, mixing quality, pot life and dispense calibration.
2. Prepare and document surfaces
Remove dust, oil, release agent and weak layers. Record moisture, temperature and any primer or abrasion step.
3. Meter, spread and assemble
Use the coating weight and working window in the grade TDS. Assemble before the usable window closes and apply uniform pressure without crushing the core.
4. Cure and validate
Do not release the assembly solely because the surface feels dry. Record cure conditions, test the required failure mode, and validate after environmental exposure where relevant.
Examples—not interchangeable settings
| Grade | System | Published process value | TDS |
|---|---|---|---|
| SPC-H2203 | 2K 4:1 | 40–50 min open time at 25 °C | Open |
| MPU-20 board grade | 1K | 120–160 g/m²; 4–8 h cure | Open |
| SPC-H250E | 2K | Pot life under 15 min at 25 °C | Open |
| SPC-HF101 | 1K | 40–50 min open time at 25 °C | Open |
Next step: verify the grade on your process
Send substrate A + B, surface treatment, application method, working-time target, daily output and destination market. SPC is the product brand of Yongjia Polyurethane Co., Ltd.; puglue.com is the company website.
Open the relevant application/selection page · Send the process on WhatsApp



