Search

How to Apply PU Adhesive Correctly: Industrial Process | SPC

Application workflow

How to Apply PU Adhesive Correctly

Correct application means following the named grade TDS and controlling the actual line—not applying one temperature, coating weight or cure time to every PU adhesive.

1. Identify the system

For 1K adhesive, control moisture exposure, open time and container handling. For 2K adhesive, verify the supplied ratio, mixing quality, pot life and dispense calibration.

2. Prepare and document surfaces

Remove dust, oil, release agent and weak layers. Record moisture, temperature and any primer or abrasion step.

3. Meter, spread and assemble

Use the coating weight and working window in the grade TDS. Assemble before the usable window closes and apply uniform pressure without crushing the core.

4. Cure and validate

Do not release the assembly solely because the surface feels dry. Record cure conditions, test the required failure mode, and validate after environmental exposure where relevant.

Examples—not interchangeable settings

Grade System Published process value TDS
SPC-H2203 2K 4:1 40–50 min open time at 25 °C Open
MPU-20 board grade 1K 120–160 g/m²; 4–8 h cure Open
SPC-H250E 2K Pot life under 15 min at 25 °C Open
SPC-HF101 1K 40–50 min open time at 25 °C Open

Next step: verify the grade on your process

Send substrate A + B, surface treatment, application method, working-time target, daily output and destination market. SPC is the product brand of Yongjia Polyurethane Co., Ltd.; puglue.com is the company website.

Open the relevant application/selection page · Send the process on WhatsApp

Contact

Table of Contents

✓ Received — we'll reply within 24 hours.